Two steps forward (and one back!) at the PV project today

 Things went well today at 11:30 am in wiring up the various parts of the PV system and positioning the LED light.






Unfortunately, Tony did a wiring mis-step and the 12v LiIon battery is now at 3v and so cannot power the charge controller. Ooops!





He will swap this battery out and finish the wiring tomorrow at 11 am with Andy :)

They will also:

1) hammer in cable clips to hold the wiring outside to the vertical piece of wood

2) install outside a grey junction box holding a 10 amp fuse.

3) Inside replace the 12v LiIon battery (hopefully the charge controller still works)

4) Add a 2nd light switch near the door.

5) Use sticky square cable holders to secure cables to the container

6) Screw strain relief clamps to the wires going to the charge controller.

7) Add a laminated system diagram card :)

8) Add a second grey junction box near the air vent.


This should then leave us with a fully functioning off-grid LED light :)